FB体育app官网

EPC Products Education UOP10Laboratory steam generator
产品中心
BBS|Hot Topic
UOP10Laboratory steam generator

Model:UOP10

Use:

Standard:

Related Products



Description

The Armfield UOP10 Laboratory Steam Generator comprises a mains fed header tank with level control, which supplies the pressure vessel

via a quiet running, heavy duty, high pressure feed pump.

The pressure vessel is built to all relevant British and European standards.

Being heavily insulated and featuring two totally immersed Incoloy heating elements, it provides a highly efficient and economical means

of generating a continuous supply of steam.

The two heating elements are individually switched and the unit will operate satisfactorily on a single element.

The integral control panel houses an on/off mains switch with switchable test functions, LEDs display the operational status of the equipment.

The UOP10 is fully safeguarded via a Magnetic Circuit Breaker (MCB) and a Residual Current Device (RCD) to give a long trouble free life.

The components of the UOP10 are mounted within a steel cabinet finished with a high gloss stove enamel paint for corrosion resistance

and long life. Front panels are hinged for easy access and are fitted with key operated handles.

It is recommended that for optimum life of the unit, feedwater should be demineralised.


Features / benefits



Simple controls allow for quick start up and shut down procedures

Variable pressure outputs

Rapid start up to full pressure and will deliver steam during heating process

Automatic top up of feed tank and boiler during normal use

Normal domestic water supply sufficient for normal operation

Low water and high pressure alarms cut power to heating element to prevent unsafe conditions

Dual locks to prevent unauthorised access to boiler internal controls

Lock out isolation switch on front of unit for safety during maintenance

Rapid and variable blowdown of steam boiler during shutdown of system

Pressure relief valves in case of over-pressurisation to prevent energetic discharge






Project Case
Solution
Download